Custom-made doors lifted to the top of a fourth (4th) level home in NW DC. We Installed new electrical wiring. We then replaced the rotted wood on the deck and installed brick pillars and brick trim to the front of the porch. In the entrance that leads to the basement, bricks were either relayed or replaced with new ones, and concrete was destroyed and resurfaced. Installed new, modernized drainage around the house to help mitigate flooding in the yard. Rebuilt chimney with stone to match the trimming of the house .